Guides
186 plain-English guides to powering data centers and remote sites beyond the grid: behind-the-meter generation, gas turbines and engines, flare gas, microgrids, batteries, nuclear, cooling and water, interconnection rules, edge sites and what it all costs.
186 guides
All guides

Building and Costs
How Much Land Does a Data Center Need? – Acres per MW

Building and Costs
What Is Powered Land? – Why Sites With Power Sell at a Premium

AI Power Demand
Why Do Data Center Power Forecasts Disagree? – How to Read Them

Building and Costs
How to Read a Data Center Announcement – MW, Phases and What Gets Built

Grid and Policy
How Do Large Loads Affect Grid Reliability? – What NERC Is Watching

AI Power Demand
How Are Hyperscalers Securing Power? – Gas, Nuclear and Grid Deals

Solar, Storage and Nuclear
How Is Battery Storage Used at Data Centers? – Backup and Smoothing

Solar, Storage and Nuclear
Will Small Modular Reactors Power Data Centers? – Timelines

Solar, Storage and Nuclear
Why Are Tech Companies Buying Nuclear Power? – Restarts, Uprates, SMRs

Building and Costs
How Are Data Centers Financed? – Leases and Project Finance

Grid and Policy
What Is Large Load Interconnection? – How Big Users Get Grid Power

Grid and Policy
How Does ERCOT Handle Large Loads? – Studies, Rules and Curtailment

Building and Costs
Data Center Site Due Diligence – Power, Water, Fiber and Permits

Solar, Storage and Nuclear
Can Geothermal Power Data Centers? – Enhanced Geothermal Explained

Grid and Policy
Do Data Centers Raise Electricity Bills? – What the Evidence Shows

Building and Costs
Is There an AI Data Center Bubble? – Stranded Asset Risk for Power

Behind-the-Meter Power
Why Do AI Training Loads Swing So Fast? – Grid and Generator Fixes

Natural Gas Power
Where Does Oklahoma's Natural Gas Come From? – SCOOP, STACK, Anadarko

Grid and Policy
Large Load Tariffs – Why Utilities Want Long Contracts

Behind-the-Meter Power
Why Data Center Siting Now Starts With Power

Building and Costs
What Is a Community Benefit Agreement? – Data Center Deals With Towns

Cooling and Water
How Much Power Does a Server Rack Use? – Rack Density Explained

Cooling and Water
How Much Water Does a Data Center Use? – Gallons per MW

Building and Costs
How Many Jobs Does a Data Center Create?

Grid and Policy
Which States Offer Data Center Tax Incentives? – How They Work

Behind-the-Meter Power
What Is an Energy Park? – Power and Compute on One Campus

Natural Gas Power
Why Are Data Centers Turning to Natural Gas? – Speed, Firm Power, Trade-Offs

Solar, Storage and Nuclear
How Much Does Battery Storage Cost per MWh? – Utility-Scale Prices

Building and Costs
3D Visualization for Energy Projects – Investor, Permit and Community Uses

Flare and Stranded Gas
Can Flare Gas Run an AI Data Center? – Scale, Uptime and the Math

Building and Costs
How Many Homes Could 1 GW Power? – Gigawatt Data Centers in Real Terms

Building and Costs
How to Present a Data Center or Power Project at a Community Meeting

AI Power Demand
How Much Power Do AI Data Centers Use? – From One Rack to a Campus

Building and Costs
How Much Does a Data Center Cost per MW? – Shell, Power, Cooling

Solar, Storage and Nuclear
What Is Long-Duration Energy Storage? – Beyond Four Hours

Natural Gas Power
Why Is the Permian Basin Attracting Data Centers? – Gas, Land, Limits

Natural Gas Power
How Much Natural Gas Does a Data Center Use? – Mcf per Day by Size

Natural Gas Power
How Much Does a Gas Turbine Cost? – $/kW and Why Prices Rose

Flare and Stranded Gas
EPA Methane Rules for Oil and Gas – What OOOOb Means for Flaring

Building and Costs
How Do Data Centers Get Zoning Approval? – Rezoning and Hearings

Natural Gas Power
What Is a Pipeline Lateral? – Getting Gas to a New Site

Natural Gas Power
Gas Turbine Lead Times – Why Orders Stretch for Years

Building and Costs
Why Do Communities Oppose Data Centers? – Noise, Water, Power

Natural Gas Power
Could Oklahoma Become a Data Center Power Hub?

Building and Costs
How Do Companies Choose a Data Center Site? – The Real Checklist

Building and Costs
What Is LCOE? – Levelized Cost of Energy in Plain English

Grid and Policy
Why Does Grid Interconnection Take So Long? – The Queue Explained

AI Power Demand
Is AI Getting More Energy Efficient? – Chips, Models and Cooling

Grid and Policy
How Does SPP Handle Large Loads? – Oklahoma's Grid Operator Explained

Grid and Policy
What Does Texas Senate Bill 6 Mean for Data Centers? – Key Rules

Flare and Stranded Gas
Who Owns Flare Gas? – Mineral Rights, Royalties and Gas Deals

Building and Costs
How Long Does It Take to Build a Data Center? – From Land to Load

Grid and Policy
Can Data Centers Do Demand Response? – Flexible Load Explained

Flare and Stranded Gas
How Bitcoin Miners Sell Flexibility to the Grid

Grid and Policy
What Is a Capacity Market? – How PJM Auctions Set Prices

Grid and Policy
Can Data Centers Connect Directly to Power Plants? – The FERC Fight

Cooling and Water
What Is a Coolant Distribution Unit? – The Heart of Liquid Cooling

Cooling and Water
CRAC vs CRAH – What Is the Difference in Data Center Cooling?

Behind-the-Meter Power
Why Are Power Transformers So Hard to Get? – Lead Times and Options

Behind-the-Meter Power
Can a Data Center Use Grid Power and On-Site Power Together?

AI Power Demand
What Is a Neocloud? – GPU Cloud Providers and Their Power Needs

Natural Gas Power
How Many MW Does a Gas Turbine Make? – Sizes From 1 to 500+ MW

AI Power Demand
How Much Energy Does an AI Query Use? – Per-Prompt Estimates

Natural Gas Power
How Do Gas Prices Affect On-Site Power Costs? – Hedging Basics

AI Power Demand
How Much Power Does a GPU Use? – TDP, Servers and Real Draw

Solar, Storage and Nuclear
Can Carbon Capture Clean Up Gas-Powered Data Centers? – Cost and Fit

Solar, Storage and Nuclear
How Do Data Centers Count Their Emissions? – Scope 1, 2 and 3

Solar, Storage and Nuclear
Can Fuel Cells Power Data Centers? – Solid Oxide Explained

Flare and Stranded Gas
Can Curtailed Wind and Solar Power Computing? – Flexible Loads

Behind-the-Meter Power
How Reliable Is On-Site Power? – Availability, Outages and Nines

Behind-the-Meter Power
What Is a Behind-the-Meter Data Center? – How It Works

Solar, Storage and Nuclear
Are Hydrogen Generators Ready for Data Centers? – Cost, Supply, Pilots

AI Power Demand
What Share of US Electricity Do Data Centers Use? – Today and Forecasts

Edge and Remote Sites
How Much Power Does Starlink Use? – Running It on Solar

Behind-the-Meter Power
What Is Bridge Power for Data Centers? – Running Until the Grid Arrives

Behind-the-Meter Power
How Long Can Data Center Backup Generators Run? – Fuel and Storage

Solar, Storage and Nuclear
How Much Land Does a Solar Farm Need per MW?

Grid and Policy
What Is a Power Purchase Agreement? – PPAs for Large Energy Users

Edge and Remote Sites
Is Starlink Good Enough for Oil and Gas Sites?

Behind-the-Meter Power
Can a Data Center Run Completely Off-Grid? – What It Takes

Solar, Storage and Nuclear
What Is 24/7 Carbon-Free Energy? – Hourly Matching Explained

Edge and Remote Sites
How Do You Secure a Remote Industrial Site? – OT Security Basics

Building and Costs
How Much Electricity Does a Data Center Use? – kW to TWh

Natural Gas Power
What Is an Aeroderivative Gas Turbine? – Jet Engines Making Power

Behind-the-Meter Power
What Does a Microgrid Controller Do? – Keeping Power Stable

Natural Gas Power
Firm Gas Supply – How Power Plants Make Sure the Fuel Shows Up

Edge and Remote Sites
How Are Cell Towers Powered Off-Grid?

Cooling and Water
What Is Direct-to-Chip Liquid Cooling? – Why AI Racks Need It

Behind-the-Meter Power
How Does an Automatic Transfer Switch Work at a Data Center?

Natural Gas Power
What Are Mobile Gas Turbines? – Trailer-Mounted Power Explained

Solar, Storage and Nuclear
What Is a Microreactor? – Nuclear Power for Remote Sites

Edge and Remote Sites
How Big a Solar and Battery System Does an Off-Grid Site Need?

Natural Gas Power
Can LNG or CNG Power a Remote Site? – The Virtual Pipeline

Natural Gas Power
Why Do Waha Gas Prices Go Negative? – What It Means for Power

Building and Costs
What Is a Data Center? – Power, Cooling and Connectivity Basics

Grid and Policy
Why Can't the Grid Just Add More Power Lines? – Permits, Cost, Time

Edge and Remote Sites
Edge AI on Remote Industrial Sites – Uses, Hardware and Power

Flare and Stranded Gas
Flaring vs Venting – Which Is Worse for Methane Emissions?

Solar, Storage and Nuclear
What Is Renewable Natural Gas? – RNG and Landfill Gas for Power

Behind-the-Meter Power
What Is Black Start Capability? – Restarting Power From Zero

Flare and Stranded Gas
Why Does North Dakota Flare So Much Gas? – The Bakken Story

Flare and Stranded Gas
How Is Flare Gas Measured? – Meters, Estimates and Reporting

Flare and Stranded Gas
How Texas Regulates Flaring – Railroad Commission Permits Explained

Cooling and Water
How Warm Can a Data Center Run? – ASHRAE Thermal Guidelines

Cooling and Water
How Does Evaporative Cooling Work in Data Centers? – Water vs Energy

Cooling and Water
Can Data Center Waste Heat Be Reused? – Real Options and Limits

Building and Costs
What Is a Modular Data Center? – Prefab, Containers and Skids

Behind-the-Meter Power
How Does Power Flow Through a Data Center? – Utility to Rack

Edge and Remote Sites
What Is Private LTE? – Cellular Networks for Industrial Sites

Building and Costs
Data Center Power Glossary – 100 Terms From BTM to WUE

Edge and Remote Sites
What Is a Micro Data Center? – Small Sites, Full Protection

Edge and Remote Sites
RTU vs PLC – What Is the Difference at a Remote Site?

Edge and Remote Sites
Why Does Satellite Latency Matter? – GEO vs LEO for Remote Sites

Edge and Remote Sites
Remote Monitoring for Generators – What to Track and Why

Flare and Stranded Gas
Is Bitcoin Mining on Flare Gas Worth It? – How Operators Do It

Behind-the-Meter Power
How Many Generators Does a Data Center Need? – Sizing the Fleet

Flare and Stranded Gas
Why Do Oil Wells Flare Gas? – Economics and Rules

Solar, Storage and Nuclear
Battery Storage Fire Safety – LFP Chemistry and NFPA 855

Building and Costs
What Does On-Site Power Cost? – Gas, Solar and Storage Compared

Building and Costs
Site Plan Renderings for Power and Data Center Projects – What Boards Expect

Solar, Storage and Nuclear
Wind, Solar and Storage Hybrids – Can They Run Off-Grid?

Natural Gas Power
How Does a Combined Cycle Power Plant Work? – Turbine, HRSG, Steam

Grid and Policy
Do You Need an Air Permit for On-Site Generators?

Cooling and Water
Is Immersion Cooling Worth It? – Single-Phase vs Two-Phase

Behind-the-Meter Power
What Does a UPS Do in a Data Center? – Batteries and Flywheels

Edge and Remote Sites
Remote Site Connectivity – Satellite vs LTE vs Private LTE vs Radio

Natural Gas Power
What Is a Gas Gathering System? – From Wellhead to Pipeline

Natural Gas Power
How Much Does an Industrial Natural Gas Generator Cost?

Behind-the-Meter Power
How to Design an Off-Grid Power System – A Step-by-Step Primer

Building and Costs
How Loud Are On-Site Generators? – Noise Limits and Fixes

Building and Costs
What Are Data Center Tiers? – Tier I to Tier IV Explained

Flare and Stranded Gas
How Much Gas Does a Bitcoin Miner Burn? – Mcf per Day per Machine

Edge and Remote Sites
Rugged Edge Servers – What Survives Heat, Dust and Vibration

Edge and Remote Sites
What Is SCADA? – How Remote Sites Report Back

Building and Costs
What Are the Types of Data Centers? – Hyperscale, Colo, Edge

Behind-the-Meter Power
How Do Generators Handle Data Center Load Steps?

Natural Gas Power
Dual-Fuel Generators – Running on Gas With Diesel Backup

Cooling and Water
Dust, Sand and Data Centers – Filtration for Harsh Sites

Flare and Stranded Gas
How Does Flare Gas to Power Work? – Waste Gas Into Electricity

Flare and Stranded Gas
How Does a Flare Stack Work? – Combustion Efficiency and Design

Edge and Remote Sites
What Is Edge Computing in the Oilfield? – Processing Data at the Pad

Behind-the-Meter Power
On-Site Power Generation Options – Gas, Solar, Fuel Cells, Storage

Flare and Stranded Gas
What Is Associated Gas? – Oil Wells and the Gas They Bring Up

Behind-the-Meter Power
What Is Switchgear? – Types for Data Centers and On-Site Plants

Solar, Storage and Nuclear
How Much Fuel Does a Solar-Diesel Hybrid Save at a Remote Site?

Natural Gas Power
What Is a Gas Supply Agreement? – Terms for Power Plant Fuel

Behind-the-Meter Power
N+1 vs 2N Redundancy – How Much Backup Power Is Enough?

Flare and Stranded Gas
What Is Stranded Gas? – Why Some Gas Has Nowhere to Go

Behind-the-Meter Power
How to Write an RFP for On-Site Power – Specs Vendors Need

Cooling and Water
How Do Data Centers Stay Cool in West Texas Heat?

Grid and Policy
Do Data Centers Need Water Rights? – Texas and Oklahoma Basics

Natural Gas Power
Gas Generator Maintenance – Intervals, Overhauls and Downtime

Cooling and Water
What Is an Absorption Chiller? – Turning Waste Heat Into Cooling

Behind-the-Meter Power
Prime Power vs Standby Power – What Generator Ratings Mean

Behind-the-Meter Power
What Is Energy-as-a-Service? – Who Owns and Runs On-Site Power

Solar, Storage and Nuclear
Can Solar Power a Data Center? – Panels, Land and Storage Math

Building and Costs
What Happens During Data Center Commissioning? – Levels 1 to 5

Cooling and Water
How Are Data Centers Cooled? – Air, Liquid and Everything Between

Behind-the-Meter Power
Power Quality for Data Centers – Frequency, Voltage and Harmonics

Flare and Stranded Gas
How Are Data Centers Built at the Wellsite? – Containers on the Pad

Solar, Storage and Nuclear
How to Size a Battery Energy Storage System – MW vs MWh

Cooling and Water
Can a Data Center Cool Without Water? – Dry Coolers and Closed Loops

Behind-the-Meter Power
Medium-Voltage Distribution in a Data Center – Gear and Layout

Cooling and Water
What Is WUE? – Water Usage Effectiveness for Data Centers

Building and Costs
What Is an EPC Contract? – How Power Projects Get Built

Edge and Remote Sites
What Is the Digital Oilfield? – Data From Wellhead to Office

Edge and Remote Sites
What Is LoRaWAN? – Low-Power Networks for Remote Sensors

Natural Gas Power
What Is Heat Rate? – The Efficiency Number Behind Every Gas Plant

Behind-the-Meter Power
What Is a Microgrid? – Island Mode, Controllers and Uses

Grid and Policy
Physical vs Virtual PPA – How Each One Works

Edge and Remote Sites
Solar Power for SCADA and Remote Monitoring Sites – Parts and Layout

Grid and Policy
Self-Generation vs Utility Power – Which Costs Less for Large Users?

Building and Costs
What Goes in an Energy Project Investor Deck? – Slides Developers Need

Natural Gas Power
Fuel Gas Conditioning Skids – What They Do and Why Engines Need Them

Natural Gas Power
Mcf to MMBtu – How to Convert Gas Volume to Energy

Natural Gas Power
How Do Natural Gas Engines Generate Power? – Sizes, Efficiency, Uses

Edge and Remote Sites
Edge vs Cloud – Where Should Remote Site Data Be Processed?

Grid and Policy
EPA Rules for Stationary Engines – RICE NESHAP and NSPS Explained

Edge and Remote Sites
Oilfield Power Generation – How Remote Pads Get Electricity

Behind-the-Meter Power
Behind-the-Meter vs Front-of-the-Meter – What Is the Difference?

Natural Gas Power
What Is Combined Heat and Power? – Using Waste Heat Twice

Natural Gas Power
Gas Turbines vs Reciprocating Engines – Which Fits On-Site Power?

Natural Gas Power
Is Wellhead Gas Good Enough to Burn? – Gas Quality and Conditioning

Building and Costs
How Much Does It Cost to Power a Data Center? – $/MWh and Bills

Cooling and Water
What Is PUE? – Power Usage Effectiveness Explained

Natural Gas Power
How Are NOx Emissions Controlled on Gas Turbines? – DLN and SCR
No guides match that search. Try a shorter word, pick a topic above, or send us your question.
Need your equipment explained in 3D?
We animate gas turbines, gensets, fuel cells, batteries, switchgear, cooling and whole campuses for sales teams, trade shows, investors and permit hearings, built by Stone Graphic Design’s oil and gas animation team.